Cupellation Furnaces - ILS

Subscribe to receive our monthly catalogue!

Get all our latest specials on consumables and equipment direct to your inbox

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Cupellation Furnaces

ILS Cupellation Furnaces

Gas (LPG & NG) and Diesel (50 place and 100 place)
Construction Cabinet of 2 & 5 mm zinc anneal steel lined with insulating firebrick
Backed with Superwool insulation board.
Muffle Dimensions 50 Place—200mm high x 260mm wide x 460mm deep
100 Place—300mm high x 480 mm wide x 560mm deep
Flame Supervision LPG : Landis & Gyr LME 44 Flame Controller & U.V. Cell
NG & Diesel : Landis & Gyr LFL1.635
Door Operation 50 Place— Counter-balanced, rising
100 Place: Pneumatic rising.  Operated by foot control
Temperature Control Electronic, Automatic control 1200oC, Type “K” Thermocouple
Electrical Requirements The furnace is fitted with a 10 Amp single phase cord and plug top.
Electrical load: 2 Amps for 50 place & 5 Amps for 100 Place
Electrical (50 place; 100 place & 168 Place)
Construction Cabinet of 2mm zinc anneal steel lined with insulating firebrick.
Backed with Superwool insulation board.
50 Place (Muffle #4) —200mm high x 260mm wide x 460mm deep
Muffle Dimensions 100 Place (Muffle #5) —300mm high x 480 mm wide x 560mm deep
168 Place (Muffle #8) —370mm high x 680 mm wide x 670mm deep
Heating Elements 12 x Silicon Carbide elements rated at 10.5kW/15kW/24kW, 3 Phase.
Power supply is per a multi-tapped double wound transformer
Door Operation 50 Place— Counter-balanced, rising
100 Place: Pneumatic rising.  Operated by foot control
Temperature Control Electronic, Automatic control 1200oC, Type “K” Thermocouple.  High temperature alarm, over temperature controller
Electrical Requirements 50 Place :10.5kW, 3 Phase
100 Place: 15kW, 3 Phase
168 Place:24kW, 3 Phase

 

REQUEST A QUOTE

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Scroll to Top